"

Appendix G: BIM Project Execution Plan Template

The complete BIM Project Execution Plan Template is available for download at Template – BIM Project Execution Plan V2.0 – MS Word Format or Template – BIM Project Execution Plan V2.0 – PDF Format. The following outlines a subset of the plan template content from the initial template cover page and table of contents.

BIM PROJECT EXECUTION PLAN
VERSION 2.1
FOR
[PROJECT TITLE]
DEVELOPED BY
[AUTHOR COMPANY]

This template is a tool that is provided to assist in the development of a BIM project execution plan as required per contract. The template plan was created from the buildingSMART alliance™ (bSa) Project “BIM Project Execution Planning” as developed by the Computer Integrated Construction (CIC) Research Group at The Pennsylvania State University. The bSa project is sponsored by The Charles Pankow Foundation, Construction Industry Institute (CII), Penn State Office of Physical Plant (OPP), and The Partnership for Achieving Construction Excellence (PACE). The BIM Project Execution Planning Guide can be downloaded at http://bim.psu.edu.

This cover sheet can be replaced by a company specific coversheet that includes at a minimum document title, project title, project location, author company, and project number.
This work is licensed under the Creative Commons Attribution-Share Alike 3.0 United States License. To view a copy of this license, visit http://creativecommons.org/licenses/by-sa/3.0/us/ or send a letter to Creative Commons, 171 Second Street, Suite 300, San Francisco, California, 94105, USA.

TABLE OF CONTENTS
SECTION A: BIM PROJECT EXECUTION PLAN OVERVIEW
SECTION B: PROJECT INFORMATION
SECTION C: KEY PROJECT CONTACTS
SECTION D: PROJECT GOALS / BIM USES
SECTION E: ORGANIZATIONAL ROLES / STAFFING
SECTION F: BIM PROCESS DESIGN
SECTION G: BIM INFORMATION EXCHANGES
SECTION H: BIM AND FACILITY DATA REQUIREMENTS
SECTION I: COLLABORATION PROCEDURES
SECTION J: QUALITY CONTROL
SECTION K: TECHNOLOGICAL INFRASTRUCTURE NEEDS
SECTION L: MODEL STRUCTURE
SECTION M: PROJECT DELIVERABLES
SECTION N: DELIVERY STRATEGY / CONTRACT
SECTION O: ATTACHMENTS

License

Icon for the Creative Commons Attribution-ShareAlike 4.0 International License

BIM Project Execution Planning Guide, Version 3.0 Copyright © 2021 by Computer Integration Construction Program is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License, except where otherwise noted.