Primary Navigation
Want to create or adapt books like this? Learn more about how Pressbooks supports open publishing practices.
Book Contents Navigation
Sign Up for Guide Updates
Executive Summary
Authors and Contributors
Reader's Guide
Acknowledgements
Citation
1. Overview of the BIM Execution Planning Procedure for Building Information Modeling
2. Establish Project Modeling Goals
3. Select Model Uses
4. Design the BIM Process
5. Define the Information Exchanges
6. Plan Infrastructure
7. Implementing the BIM Project Execution Planning Procedure
8. BIM Project Execution Planning for Organizations
9. Conclusions and Recommendations
Appendix A: BIM Goals Worksheet
Appendix B: Model Use Descriptions
Appendix B-1: Model Use: Monitor System Performance
Appendix B-2: Model Use: Monitor Space Utilization
Appendix B-3: Model Use: Monitor Assets
Appendix B-4: Model Use: Monitor Maintenance
Appendix B-5: Model Use: Compile Record Model
Appendix B-6: Model Use: Layout Construction Work
Appendix B-7: Model Use: Fabricate Product
Appendix B-8: Model Use: Author Temporary Construction Systems Model
Appendix B-9: Model Use: Author Construction Site Logistics Model
Appendix B10: Model Use: Create Construction Documentation
Appendix B-11: Model Use: Analyze Sustainability Performance
Appendix B-12: Model Use: Review Design Model(s)
Appendix B-13: Model Use: Coordinate Design Model(s)
Appendix B-14: Model Use: Analyze Lighting Performance
Appendix B-15: Model Use: Analyze Structural Performance
Appendix B-16: Model Use: Analyze Energy Performance
Appendix B-17: Model Use: Author 4D Model
Appendix B-18: Model Use: Author Cost Estimate
Appendix B-19: Model Use: Analyze Program Requirements
Appendix B-20: Model Use: Author Design
Appendix B-21: Model Use: Capture Existing Conditions
Appendix B-22: Additional Model Use: Analyze Site Selection Criteria
Appendix B-23: Model Use: Analyze Engineering Performance
Appendix B-24: Additional Model Use: Validate Code Compliance
Appendix B-25: Additional Model Use: Analyze Emergency Management
Appendix C: Model Use Analysis Worksheet
Appendix D: Process Map Templates
Appendix E: Example Process Maps for Sample Laboratory Project
Appendix F: Information Exchange Worksheet
Appendix G: BIM Project Execution Plan Template
Appendix H: BIM Execution Planning Category Comparison
Appendix I: Version History
Appendix J: Links to All Template Documents
Appendix K: Citations and Sources for Additional Information
Appendix L: Glossary
Table H.1: BIM Execution Planning Category Comparison
Previous/next navigation
BIM Project Execution Planning Guide, Version 3.0 Copyright © 2021 by Computer Integration Construction Program is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License, except where otherwise noted.